| Application fit and performance envelope |
20% |
Confirm required continuous and peak force, travel, speed, acceleration, payload, and duty cycle. These values depend on the complete machine and operating profile. |
Application-specific sizing report; force-versus-speed curves; stated continuous and peak ratings; duty-cycle and thermal assumptions. |
Check that the proposed operating point stays within the documented limits, including acceleration and continuous operation. |
| Motor design suitability |
12% |
Compare motor construction against the application. Iron-core designs generally offer higher force density, while ironless designs avoid cogging force and can suit applications needing smooth motion. |
Motor cross-section or construction details; force and cogging-force data where applicable; explanation of design trade-offs. |
Match the design to process needs such as smooth low-speed motion, force density, and allowable heat generation. |
| Positioning performance |
14% |
Assess accuracy, repeatability, resolution, settling time, and straightness as system-level requirements. Performance depends on the motor, feedback device, controller, mechanics, and installation. |
Test conditions and measurement method; feedback-device options; positioning and repeatability data for a comparable configuration. |
Compare results measured under similar loads, travel lengths, temperatures, and control settings. |
| Thermal management and duty cycle |
10% |
Review heat dissipation, ambient-temperature limits, cooling requirements, and the effect of duty cycle on continuous force. |
Thermal data; cooling recommendations; derating curves; installation and ventilation requirements. |
Verify that the required force can be sustained in the actual enclosure and ambient conditions. |
| Controls and system integration |
10% |
Check compatibility with the buyer’s servo drive, feedback interface, control network, cables, and motion-control architecture. |
Interface specifications; wiring diagrams; configuration guidance; integration support scope. |
Confirm compatibility before ordering and identify which components are included in the quotation. |
| Quality assurance and traceability |
10% |
Evaluate documented inspection, production consistency, change control, and traceability for motors and critical components. |
Quality-process documentation; inspection records or sample reports; serial-number and revision traceability details. |
Ask how production changes are communicated and how performance is verified before shipment. |
| Customization and engineering support |
8% |
Compare the ability to adapt winding, dimensions, connectors, cables, feedback options, and mounting arrangements. |
Design review process; customization limits; sample lead time; named technical contact and support hours. |
Clarify engineering responsibilities, prototype costs, and approval steps for custom configurations. |
| Delivery, logistics, and service coverage |
8% |
Review production lead time, shipping options, export documentation, spare-parts availability, and support across relevant time zones. |
Written lead-time estimate; shipping and packaging details; service and spare-parts policy; export-document list. |
Confirm delivery terms, responsibility for import requirements, and the process for urgent technical support. |
| Compliance and operating environment |
5% |
Check applicable market requirements and the operating environment, including temperature, contamination, ingress protection, and machine safety needs. |
Relevant declarations or test documents; environmental limits; installation and safety instructions. |
Verify that documents apply to the quoted configuration and the destination market; requirements vary by application and jurisdiction. |
| Total cost and lifecycle value |
3% |
Compare purchase price alongside integration effort, cooling, maintenance, spares, expected service life, and downtime risk. |
Itemized quotation; warranty terms; recommended spare parts; maintenance guidance. |
Compare equivalent system scope and evaluate operating costs over the planned service period. |