| PMDC MOTOR Technical Data | |||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Model | Rated Voltage (V) | No-Load | Rated | Stall | |||||||
| Operating Range | Nominal | Speed (RPM) | Current (mA) | Speed (RPM) | Current (mA) | Torque (mN.m / gf.cm) | Power (W) | Current (mA) | Torque (mN.m / gf.cm) | ||
| FF-030PA | 11155 | 2.0~4.0 | 3VDC | 7200 | 45 | 5500 | 170 | 0.49/5 | 0.28 | 590 | 2.06/21 |
| 1592 | 2.0~4.0 | 3.5VDC | 14300 | 90 | 12500 | 300 | 0.49/5 | 0.64 | 2000 | 3.92/40 | |
| FF-030PK | 05440 | 3.5~12.0 | 12VDC | 11000 | 20 | 7800 | 65 | 0.49/5 | 0.4 | 180 | 1.67/17 |
Established in 2005, the enterprise is a high-tech manufacturer integrating the research, development, production, and sales of various kinds of micro DC motors, geared motors, planetary geared motors, shaded pole geared motors, and specialized gearbox motors. The products are widely used in automobiles, communications equipment, smart homes, medical equipment, intelligent security, household appliances, kitchen equipment, machinery, electronics, and other high-end transmission structures. These products are exported to more than 50 countries and regions globally.
Dozens of advanced production equipment and testing instruments have been introduced from Germany, Japan, Switzerland, and other countries to strictly control the quality of each motor.
We are a factory. We have specialized in micro DC motors and DC gear motors for more than 14 years.
We can establish an online Trade Assurance Order, which allows payment via MasterCard, Visa, etc. Customers can also choose to pay through PayPal or T/T.
Yes, we can customize a suitable motor according to our customers' specific requirements.
Yes, we have CE, FCC, ISO, and other relevant certificates. If you have other specific certificate requirements, we can apply for them on your behalf.
We employ professional inspection staff on every production line process. After the assembly of each motor is complete, we use specialized quality assurance machinery to conduct tests, including Hardness Testers, 2.5D Image Testers, Salt Spray Chambers, Life Testers, Temperature Test Machines, and Noise Testers.
The typical lead time varies depending on the design complexity and order volume, generally ranging from 3 to 5 weeks from technical verification approval.